Enabling seamless tech transfers
How QbDVision helped CDMO Viralgen reduce total tech transfer time from 6-12 months to 3 months
With QbDVision, Viralgen onboards new customers in 75% less time
When a pioneering clinical-stage gene therapy company came to them with an innovative AAV product and a dramatically compressed timeline, Viralgen didn’t walkinto the kickoff with spreadsheets and MSFT templates. They came with their new customer’s process pre-built ina run-ready digital platform that accelerated onboarding from Day 1. The result: Not only a handoff executed with unprecedented speed, efficiency, and precision, but also a transformational new approach to tech transfers that helped Viralgen set a new standard for CDMO partnerships.
What this top CDMO delivered with our platform
Minimized friction
Prebuilt process platform, structured templates, and dynamic visualizations that simplified and accelerated alignment.
Confident collaboration
Single source of truth where quality, risk, and process data are structured, visible, and immediately actionable for every stakeholder.
Customer trust
Speed, preparation, and ease of use that built a new partner’s confidence in Viralgen’s process, infrastructure, and professionalism.
Key QbDVision tools
Structured QTPP & CQA templates
Pre-configured process maps
Digital risk assessment framework
From five-alarm workflows to a foundation of scalable excellence
Empowered by our QbDVision, Viralgen laid the groundwork for countless successful partnerships to come. Together, we built a model they can scale confidently, repeatably, and without compromise, strengthening each new collaboration with the structure that powered the first.
“From the very first walkthrough, the client could see that we were ready to start work: We weren’t just presenting a plan, we were ready to execute it. QbDVision makes tech transfers feel less like a handoff and more like a hand-in-glove fit.”
Isabel Guerrero, MSAT Senior Scientist, Viralgen
Before QbDVision
6–12 months to onboard a new gene-based product
Handoffs via chaotic, redundant, disconnected documents
Inconsistent clarity on responsibilities and review tasks
Constant delays in stakeholder reviews and signoffs
Unstructured risk assessments based on asynchronous data
With QbDVision
3-month accelerated onboarding process
Centralized workspace with version control
Clear, predefined review points with visual process tree
Real-time, collaborative reviews and instant approvals
Digitized, templated, collaborative risk analyses
Deliver therapies faster with Digital CMC
Turn CMC data from a bottleneck into a strategic asset. Talk to us today.